The Building of the Lincoln Tunnel: Titans’ Work Beneath the Hudson

A closeup of the cutting shield. The steel edge projects forward at the tops and the sides like the visor of a cap and protects workers underneath from falling debris. A battery of hydraulic jacks with a thrust of 6,000 tons pushed the cutting shield through the earth and into the silt and rock of the riverbed.

Bookmark the permalink.